The UC Davis Emergency Pavilion was built with 4mm Alucobond in an Oyster finish. ESC worked closely with C/S Erectors to fully integrate ESC’s DRY panel system with custom fin extrusions provided by C/S Erectors. Such coordination emphasized the ESC’s capability to provide excellent customer service and exceptional fabrication solutions to produce a design team’s intent. As a result, this project boasts a unified, clean gasket system building skin which matches the existing construction.
CHONG + ODELL Associated Architects
Sacramento, California
Swinerton Builders
San Francisco, California
C/S Erectors
San Ramon, California
Oyster 4mm PE Core Alucobond
3A Composites Benton, Kentucky