The Denver News Agency building presented a complex challenge. Located at one of downtown Denver’s busiest intersections, on-site storage and prep space was non-existent. The solution was a unitized system in which Elward Systems installed its EV-A.50 Guttered and Gasketed DRY panel system on sections of framing, complete with sheathing and weatherproof membrane. The units were transported to the site via flatbed truck and were lifted directly from the truck onto the structure.
DLR Group
Denver, Colorado
Hensel Phelps
Denver, Colorado
Newspaper White 4mm Plus Core Alucobond
3A Composites Benton, Kentucky