The LA LIVE project in downtown Los Angeles was part of a three building multi use project that included the Nokia Theater. Elward Systems EV-A.50 Guttered and Gasketed Dry panel system was utilized successfully on all three projects. The projects were delivered on a simultaneous delivery schedule. Elward Systems delivered more than 8,000 panels over a 15 month period on the three projects, without disruption to the construction schedule. Elward Systems was proud to be a part of this quality high profile project.

Architect

ELS Architecture and Urban Design
Berkeley, CA

General Contractor

Clark Construction
Costa Mesa, CA

Material Description

Silver Metallic 4mm Plus Core Alucobond
3A Composites Benton, Kentucky