The LA LIVE project in downtown Los Angeles was part of a three building multi use project that included the Nokia Theater. Elward Systems EV-A.50 Guttered and Gasketed Dry panel system was utilized successfully on all three projects. The projects were delivered on a simultaneous delivery schedule. Elward Systems delivered more than 8,000 panels over a 15 month period on the three projects, without disruption to the construction schedule. Elward Systems was proud to be a part of this quality high profile project.
ELS Architecture and Urban Design
Berkeley, CA
Clark Construction
Costa Mesa, CA
Silver Metallic 4mm Plus Core Alucobond
3A Composites Benton, Kentucky