The Microsoft Theater project in downtown Los Angeles was part of a three building muti-use project called LA Live. The EV-A.50 Guttered and Gasketed DRY panel system was utilized successfully on all three projects. The projects were delivered on a simultaneous delivery schedule. Award Systems delivered more than 8,000 panels over a 15 month period on the three projects, without disruption to the construction schedule. Elward Systems was proud to be part of this quality high profile project.